The Next Mobility Hub is the “fuel station” of the future: the facility offers its customers various forms of energy – from electric charging solutions for cars and trucks to conventional fuels and hydrogen for heavy-duty transport.
A solution was sought that optimizes energy consumption at the site while simultaneously avoiding costly grid expansion.

Customer Profile:
- Maier & Korduletsch Group
- Operator of fueling and charging infrastructure
- Passau - Germany
- High power demand due to 12 fast-charging points and a hydrogen compressor
- Existing installations: electric fast-charging park (12 fast-charging points), hydrogen refueling station for heavy-duty transport, fuel island for conventional fuels
Requirements:
- High power for fast-charging infrastructure
- Grid-friendly operation
- Cost-effectiveness
- Future-proof, scalable solution
- Outdoor-capable system
Projekt Details:
- 2x FENECON Industrial L
- Power: 2 × 736 kW
- Capacity: 2 × Industrial L units, each with 1,288 kWh capacity
- Installer: Bachner Group
Results:
- Grid expansion avoided through intelligent peak load shaving
- Reliable operation of 12 fast-charging points even under high utilization
- Integration of e-mobility, hydrogen, and conventional fuels into a grid-supportive overall system
Conclusion:
By deploying two FENECON Industrial L energy storage systems, a highly modern and scalable mobility hub was realized. Intelligent energy management increases self-consumption, reduces grid strain, enables high charging capacities, and creates the foundation for additional revenue potential through electricity trading.